ZAN projects
HOUSE FOR CLIMBER
Annotation
In the project "House for climber" I tried to connect the private part (coach's flat) and the public part (climbing wall with gym). Both parts are accessed from a passage that crosses the highest part of the building.
The entrance to the private part is located in the left wall of the passage and opens into a hallway, which is connected to a staircase leading to the floor -1 of the residential part of the building. Here is the kitchen connected to the dining area and the living room. The living area also has a -2nd floor, comprising living rooms and sanitary facilities.
The public part of the house is 5 storeys high and contains a climbing wall, gym and facilities. On the -1st floor there is a gym and changing rooms with sanitary facilities. On the second floor there is a climbing wall.